Skip to content
Cleanpricing

Post-Construction Cleanup Prices Differently Than a Recurring Contract

Rough clean, final clean, and touch-up clean each carry their own square-footage rate — quoting a one-time construction job at your recurring office rate is the fastest way to lose money on it.

See recurring office rates

A one-time construction job isn't a recurring contract with a bigger number

Post-construction cleanup gets requested constantly by facilities managers and general contractors finishing a build-out, and it's tempting to price it the same way you'd price a recurring office contract — take your per-square-foot rate and multiply. That undercuts almost every time.

Recurring office cleaning assumes a space that's already clean and just needs maintaining: empty trash, vacuum carpet, wipe surfaces. A construction site has drywall dust in the HVAC returns, adhesive residue on floors, protective film on fixtures, and debris in places a maintenance crew never touches. The labor hours per square foot run two to four times higher than a maintenance visit, and the job usually happens once, not on a repeating schedule — so there's no second visit next week to catch what you missed on the walkthrough.

Treat it as its own line of work with its own rate card, not a variant of your office rate.

Three phases, three rates

Each phase is billed once, not monthly, and most jobs only need one or two of the three.

Rough clean — $0.15–$0.25 / sq ft

Happens right after major construction debris is hauled out. Focus is a heavy debris sweep, removing tape and stickers, and a first pass on windows and fixtures so trades can keep working without tracking dust everywhere.

Final clean — $0.20–$0.35 / sq ft

Done right before occupancy. Full detail: inside cabinets and drawers, light fixtures, baseboards, window tracks, and every surface wiped to a move-in standard. This is the phase the client remembers and photographs.

Touch-up clean — $0.05–$0.10 / sq ft

A short return visit a few days after occupancy to catch dust that settled after HVAC startup and foot traffic tracked back in. Some contractors fold this into the final clean price as a two-visit package instead of billing it separately.

What to check on a construction walkthrough

The scope changes more here than on any office walkthrough — confirm these before you write a number.

  1. Confirm what "clean" the contract actually requires

    Ask whether you're being hired for rough, final, or both — general contractors sometimes say "cleaning" when they mean only debris removal, which is a different trade and a different price.

  2. Check who removes bulk debris

    Construction debris — drywall scraps, packaging, pallets — is usually a dumpster or hauling job, not a cleaning job. Confirm it's gone or budgeted separately before you price square footage.

  3. Ask about HVAC startup timing

    If HVAC turns on before your final clean, dust that already settled gets stirred up again — that changes whether you need a touch-up visit, and it should be priced in up front rather than added later.

  4. Get the occupancy date in writing

    Final clean is usually the last trade in before occupancy, which means your schedule has zero slack if an earlier trade runs late — build a cancellation and rescheduling fee into the terms.

Questions about pricing post-construction jobs

Can I use my recurring office rate for a one-time construction job?

No — construction debris, a heavier dust load, and the fact that there's no second visit to catch what you missed all push the effective rate well above a maintenance contract. Price it from the phase rates above, not your monthly office rate.

Who's usually paying for this — the general contractor or the building's tenant?

Ask directly; it varies by job. If the general contractor is paying, they're comparing you to other construction-cleanup specialists, not office janitorial companies, and your bid should read that way.

Does this ever turn into a recurring contract?

Often, yes — a clean final walkthrough is a strong pitch for the ongoing maintenance contract on the same building. Some contractors intentionally price the one-time job near breakeven to win the recurring bid that follows.

What if the space is smaller than a typical office job I'd normally quote?

Set a minimum job price regardless of square footage — travel time, equipment setup, and disposal costs don't scale down with a small space, and a per-square-foot rate on a 2,000 sq ft suite can undercharge for the actual hours involved.

Get help pricing your next post-construction job

Send us the square footage and phase and we'll help you sanity-check the number before you submit it.

Get a number for your job